Hello, my name is mizan. i am a student from indonesia and now doing some task about pile soil interaction.
i found error when trying to create soil plot from my psiinp file.
thank you for your attention.
The maximum depth of soil data should always be greater than pile penetration for a real project. It's not practical that the pile hang in air.
Answer Verified By: Mizan M
can i know how to solve this problem?
sorry for late reply. I try to put another maximum depth of soil data, sir.