• multiwheel load-out onto a cargo barge

    Hi, I’m trying to set-up the load-out and load-in of a trailer/multi-wheel onto a cargo barge with MOSES. Basically is a ballast analysis The goal is to control the ballast step-by-step during the embarking of the multi-wheel on board the cargo barge…