• Nozzle modeling: W41-27 error

    I am trying to model a 20" STD connection to a tank of 40 m diameter at 1 m above ground level, filled to 13 m high. Naturally I use the API 650 flexibility method (I assume it's using the Appendix P calculations, meant for tanks above 36 m in diameter…