You are currently reviewing an older revision of this page.
01. When choosing a 8" nominal shell size the O.D. is reflected as 8.78" O.D. (it should be 8.625").
02. How to import Aspentech edr file into AutoPIPE Vessel?
03. For a shell and tube exchanger with fixed tubesheets, the AutoPIPE Vessel is locked with the "Mechanical cleaning" option even if the option is unchecked?
04. How to manage the baffle spacing of a heat exchanger in AutoPIPE Vessel?
05. How to manage the number of Tubesheets in an AutoPIPE Vessel heat exchanger
06. How to see the pass order number and how to change it in an AutoPIPE Vessel model?
07. Model imported from HTRI suggest tubesheet has 360 tubes, however AutoPIPE Vessel suggest only 332, why?
08. Number of Heat exchanger tubes and path are different in the AutoPIPE Vessel report, why?
09. When changing the material on tubeside, focus of the model changes to a different location in an AutoPIPE Vessel model, why?
10. Why are the ASME 2019 - appendix A-2 calculation for Tubesheet with tubes expanded + seal welded not performed?
11. Why is tubesheet layout not full of tubes?
AutoPIPE Vessel - Frequently Asked Questions
Bentley AutoPIPE