Bentley Communities
Bentley Communities
  • Site
  • User
  • Site
  • Search
  • User
AutoPIPE
  • Product Communities
AutoPIPE
AutoPIPE Wiki 02. Appears that cost estimation is not considering some items from the model file, how to resolve this issue?
    • Sign In
    • -Pipe and Vessel Stress Analysis - Wiki
      • +.Bentley AutoPIPE
      • -.Bentley AutoPIPE Vessel (powered by Microprotol)
        • +Features and Bugs
        • +General Information
        • -Support Solutions and FAQ's
          • +Air Coolers
          • Boilers
          • +Calculations
          • +Coils
          • -Cost Estimation
            • 01. Are there any new Options for creating new cost estimation files in AutoPIPE Vessel
            • 02. Appears that cost estimation is not considering some items from the model file, how to resolve this issue?
            • 03. How to change the rates in AutoPIPE Vessel cost estimation module?
            • 04. Is it import about what units are used (i.e. SI or US) in the model and the cost estimation module in AutoPIPE Vessel?
            • 05. In AutoPIPE Vessel's cost estimate module, when I enter an hourly rate in Estimate Configuration file Properties, the rates do not come out right in the excel cost estimation report, why?
          • +Drawings
          • +Expansion Joints
          • +Import / Export
          • +Interface
          • +Lifting Lugs
          • +Loads and Load Combinations
          • +Material, Material Database, and Default Libraries
          • +Nozzles and Flanges
          • +Pressure Vessels
          • +Report
          • +Shell and Tube Heat Exchangers
          • +Shells
          • +Soil
          • +Tanks
          • +Units
          • +Vortex Shedding
          • +Weld Joints
        • +System Messages
        • +Video Gallery
      • +ADL PIPE
      • +Bentley AutoPIPE Nozzle
      • +Bentley PlantFLOW
      • +Bentley PULS
    • +AutoPIPE Brand Learning Resources
    • +Attend a live meeting with an AutoPIPE Analyst

    You are currently reviewing an older revision of this page.

    • History View current version

    Q. Appears that cost estimation is not considering some items from the model file, how to resolve this issue?

    Answer:

    This is a problem with your original model file (.emvd file). Check the model, check if the chamber number is correct under all the components' Material tab eg. for a single chamber vessel the chamber numbers should be 1 for all components. Correct the chamber number if you find it is incorrect and rerun the model file and then try creating the cost estimation file from the corrected .emvd file, the problem should be resolved.

    Communities
    • Home
    • Getting Started
    • Community Central
    • Products
    • Support
    • Secure File Upload
    • Feedback
    Support and Services
    • Home
    • Product Support
    • Downloads
    • Subscription Services Portal
    Training and Learning
    • Home
    • About Bentley Institute
    • My Learning History
    • Reference Books
    Social Media
    •    LinkedIn
    •    Facebook
    •    Twitter
    •    YouTube
    •    RSS Feed
    •    Email

    © 2023 Bentley Systems, Incorporated  |  Contact Us  |  Privacy |  Terms of Use  |  Cookies