Applies To | |
Product(s): | OpenPlant Modeler |
Version(s): | 08.11.11.87 (SS6) & Above |
Environment: | Windows 7/8.1/10 (64 bit) |
Area: | component |
Subarea: | Place Note - Pipeline Start Point |
Original Author: | Rahul Kumar, Bentley Product Advantage Group |
Introducing new tool in OpenPlant Modeler under “Place Note” option, which can control the order of Iso sheets generated in Pipeline Manager using, “AutoGenerate Iso-Sheet” option. To verify the result, generate Iso-Sheet with default setting through pipeline Manager using “AutoGenerate Iso-Sheet” option. Notice the Iso-Sheet assigned by default. See image below.
See below steps described in detail to re-order the Iso-sheet as per choice.
communities.bentley.com/.../component---openplant-modeler
Bentley's Product Advantage Group requests that you please confine any comments you have on this Wiki entry to this Comments or Corrections?" section. THANK YOU!