In Isometric BOM, Pipe with different descriptions does not count separately. It produces a combined length/Quantity in Bill of Material. Requirement is to get a separate quantity in bill of Material whose description found to be different. This can be done by modifying the schema through class editor. It can be experienced using both OpenPlant modeler and AutoPlant Modeler. This has been shown in context with OpenPlant Modeler and OpenPlant Isometrics Manager. However similar approach could be utilized for AutoPLANT modeler and OpenPlant Isometrics Manager, by navigating to different project path.
Different pipe description expected as B36.10 4 PE Pipe & B36.10 4 PE Pipe_For Coating on same pipeline.
http://communities.bentley.com/products/plant/design___engineering/w/plant_design_and_engineering__wiki/13393.settingsattributes-openplant-isometrics-manager
Bentley's Technical Support Group requests that you please confine any comments you have on this Wiki entry to this Comments or Corrections?" section. THANK YOU!