Applies To | |
Product(s): | OpenPlant Modeler CONNECT Edition |
Version(s): |
CONNECT Edition
|
Environment: | Windows 10 (64-bit) |
Area: | PlantSight |
Subarea: | N/A |
Original Author: | Harshavardhan K, Bentley Product Advantage Group |
Background
This article illustrate the basic workflow of Check -in ,Check-out and Update in OpenPlant Modeler.
This article involves two steps
- Creation of i-model and Connect Workset to i-model created in i-model hub portal
- Check-in/Check-out Operation in OpenPlant Modeler
Steps to Accomplish
Creation of i-model & Connect Workset to i-model created in i-model hub portal
- Open the Bentley Cloud Services homepage, sign-in with the required credentials and click on Projects tab.
- In the projects tab, click on Register a Project to register the project to use the iModel Manager service.
- Provide the necessary details in the fields and click on Register to create a project.
- Click on the created project and scroll down and go to i-Model Manager.
- In the iModelHub webpage that opens, click on Create i-Model.
- In the Create an i-Model dialog, provide a suitable name and description to the i-Model.
- Launch OpenPlant Project Administrator click on OpenPlant metric workset and from projects tab select associate.
- In project to associate window, select the project registered above and click on Associate and now a green helmet is displayed on the WorkSet once associated.
- Click on provision button and select the i-model we have created to provision all the schemas from the WorkSet. Once done click on Finish button.
Check-in/Check-out Operation in OpenPlant Modeler
- Launch OpenPlant Modeler open a blank file and project will connect to PlantSight project. Place equipment and with a small pipeline routed (sample model).
- In the PlantSight tab above, click on Check-in all button to push whole model to PlantSight and in PS differences windows click on Check-in. Below image from PlantSight
Note :To view below model in PlantSight, Open PlantSight Portal from PlantSight tab and click on Visualize and 3D Model.
- To check-out components from PlantSight, click on File Explorer expand unit and right click on Unit A and click on Check out, model will check out to active dgn.
After Checkout components
- Click on Update all and it will push only changes which have been made after checked out components. Place a butterfly valve as shown below and click on Update all in PlantSight tab
Notice the Globe valve has been updated here.
Still a Problem?
If above problem still persists, then please create a Service Request and contact the Bentley Product Advantage group. Please include a list of all relevant details to get in depth analysis for a solution or workaround