08.11.12.03
In this wiki article, we will explore the recommended workflow that needs to be followed upon using Follow Page Connector and Update in OpenPlant PID SS10. This wiki also explains about the possible error message or prompt upon using Follow Page Connector and Update if correct workflow has not been followed. When a page connector has been placed in a drawing file the drawing file must be synced and checked-in. If both drawing (having linked page connectors) have not synced, performing follow page connector and update, the application will prompt some warning or error message. Refer image as shown below.
As a part of recommended workflow, refer below mentioned steps and workflow.