Applies To | |
Product(s): | OpenPlant PID CONNECT Edition |
Version(s): |
10.09.01.08 |
Environment: | Windows 8.1/10 (64-bit) |
Area: | Synchronization to PlantSight |
Subarea: | |
Original Author: | Fer Mykiel Gonzales,Bentley Technical Support Group |
When the Off-page Connector is deleted in the DGN, the sync drawing in PlantSight stops. The Message Center shows the following error message:
Steps to Resolve
1. Open PID.cfg from %Workset_Standards_Location%\OpenPlant\PID\
2. Search for IMODEL_SYNC_DELETECOMPONENTS
3. Change the variable value to either 0 or 1.
4. Save PID.cfg
5. Try syncing the DGN to PlantSight with the OPC deleted
Still a Problem?
If above problem still persists, then please create a Service Request and contact the Bentley Technical Support group. Please include a list of all relevant details to get in depth analysis for a solution or workaround