Hi,
How can I close all active task navigation dialogs and open a single one? I have a custom DGNLIB and I want to open only my custom task dialog.
Regards,
Ahmet Sedat ALIS
I have also created a custom .dgnlib to develop my own custom task dialog. In order to see only my custom task dialog without all of the other task headings that no use I found the config variable MS_DEFAULT_MAINTASKPATH = MT Tasks. MT Tasks is the header displayed in Task Manager Dialog. I have this defined in my standards.cfg file so everyone is set up this way by default.
Microstation CONNECT 10.17.00.209
ORD CONNECT 2021 R1 10.10.1.3
Microstation v8i SS 10 08.11.09.919
Power InRoads v8i 08.11.09.615
ProjectWise 10.0.3.453
Unknown said: I have also created a custom .dgnlib to develop my own custom task dialog. In order to see only my custom task dialog without all of the other task headings that no use I found the config variable MS_DEFAULT_MAINTASKPATH = MT Tasks. MT Tasks is the header displayed in Task Manager Dialog. I have this defined in my standards.cfg file so everyone is set up this way by default.
Hi mwlong,
Thank you. This sounds good. :) MS_DEFAULT_MAINTASKPATH does not exist as a system configuration variable on Workspace > Configuration. I defined it as a user parameter and set it to my custom task header. After saving ucf file and re-launch, it doesn't select my custom task dialog.
Kind regards,
Sedat AlisAEC Technology Inc.
I'm not sure why it is not working. I did find this key-in to change the active task "task active MT Tasks" (no quotes needed". If I use "task active Drawing" it switches the task dialog to display only the Drawing tasks. You could add the key in for different tasks to a function key or a custom icon or menu item.
Hope that is something that will solve your problem.
Unknown said: If I use "task active Drawing" it switches the task dialog to display only the Drawing tasks.
I tried this key-in in MicroStation V8i (SELECTseries 3) Update 2 and it activates the task (opens it), but doesn't make the task the only visible as it can be done by selecting the task from the task tree.
Bentley Accredited Developer: iTwin Platform - AssociateLabyrinth Technology | dev.notes() | cad.point