I'm using Prostructures Connect Edition V.10.01.00.023.

Is it possible to change existing rebar that was placed in a project to a different Rebar Code?

.

Parents
  • Hi Nicole,

    Yes it is possible to change, but it will remove all bar marks. and will allow you  to choose which bar size to convert modeled bar sizes to which bar size in changed code.
    And also if you change in one location it will automatically change all the same Rebar to that particular change.

    Regards,
    Sandip Kar
    Product Engineer - Bentley Systems

Reply
  • Hi Nicole,

    Yes it is possible to change, but it will remove all bar marks. and will allow you  to choose which bar size to convert modeled bar sizes to which bar size in changed code.