Hi experts,
I am testing a corridor drop that is 47m long. As a test I have set the drop interval at 4.7m I have also set the Handle length factor to 4.7m in Civil Standards (shown in cyan)
My question is how do I get the drops to exactly match my specified interval? I would expect 10 sections of 4.7m (47m corridor)
As you can see below I have buffers at the start/end of my corridor template drop, changing the interval or minimum transitions does not seem to work.
I want the corridor drops to match the cyan handle length factors.
Many Thanks