• Inconsistency in Component quantity report format.

    Hi, I am exporting component quantity reports, every time component order changing as shown in below picture. It is getting difficult to do manual mass haul calculations at 10m interval for about 55km. Do we have any option to keep the same component…
  • Calculate Earth work Quantity based on cross section

    Hi friends, I have some query about the earth work calculation when we generated cross section based on existing surface and design surface then normally the volume quantity comes fill & Cut some amount in the section and normal get the prepared sub…
  • End-area volumes problem

    Hey Power Civil SS4. 08.11.09.878. I have some issues with calculations of end-area volumes. It seems that Power Civil is calculating at each station, but not showing totals. It has worked on previous version 08.11.09.845. Edgaras
  • [V8i] End-Area Volume Problem in Cross Sections

    Hi everyone, i have a problem when i make volume calculations. I have a different type road section, with tunnel and with a channel between them. The road passes through a river so we make some culverts under the tunnels for construction. My problem…
  • Area Of Cross Section

    I want to calculate the Area of cross section at every 20 m interval. I have already developed the cross section. Area should come in layer wise like blanketing and sub grade, Filing or cutting at every 20 m interval.
  • earthwork template not working properly

    I am using a template with top of bank (fill) 8.87m wide, i needed 10m wide so amended it but after running it still shows a 8.87m wide, can any one plz have a look at this template and advise plz( its named as single track in attached itl file)
  • cut and fill

    hi every one i have few question about earth work in power rail track. Will keep it brief. 1-how to show cut and fill in different colours plan view, 2-how to show bridges and tunnels in different colour in vertical profile. 3-I think the end…