Bentley Communities
Site
Search
User
Site
Search
User
Product Communities
OpenRail
OpenRail Forum
Sign In
All tags
Earthwork
alignment
Alignments
Bentley
Bentley Power Rail track
Bentley Rail Track
Bentley railtrack
BRT
corridor modelling
Cross
cross section
Cross Sections
Culvert
cut and fill
earth work
embankment
End Area Volumes
InRoads
OpenRail Designer
OpenRoads Designer
power rail track
roadway
section
SS2
template
Tunnel
Inconsistency in Component quantity report format.
Venkata Raghuram Sudarsanam
Hi, I am exporting component quantity reports, every time component order changing as shown in below picture. It is getting difficult to do manual mass haul calculations at 10m interval for about 55km. Do we have any option to keep the same component…
9 months ago
OpenRail
OpenRail Forum
Calculate Earth work Quantity based on cross section
Boopathiraj Krishnan
Hi friends, I have some query about the earth work calculation when we generated cross section based on existing surface and design surface then normally the volume quantity comes fill & Cut some amount in the section and normal get the prepared sub…
over 4 years ago
OpenRail
OpenRail Forum
End-area volumes problem
Edgaras Gudauskas
Hey Power Civil SS4. 08.11.09.878. I have some issues with calculations of end-area volumes. It seems that Power Civil is calculating at each station, but not showing totals. It has worked on previous version 08.11.09.845. Edgaras
over 5 years ago
OpenRail
OpenRail Forum
[V8i] End-Area Volume Problem in Cross Sections
Can KABADAYI
Hi everyone, i have a problem when i make volume calculations. I have a different type road section, with tunnel and with a channel between them. The road passes through a river so we make some culverts under the tunnels for construction. My problem…
over 6 years ago
OpenRail
OpenRail Forum
RE: Mass haul diagram in Bentley Rail track.
Satish Kumar
over 7 years ago
OpenRail
OpenRail Forum
Area Of Cross Section
satish kumar
I want to calculate the Area of cross section at every 20 m interval. I have already developed the cross section. Area should come in layer wise like blanketing and sub grade, Filing or cutting at every 20 m interval.
over 8 years ago
OpenRail
OpenRail Forum
earthwork template not working properly
murtaza gul
I am using a template with top of bank (fill) 8.87m wide, i needed 10m wide so amended it but after running it still shows a 8.87m wide, can any one plz have a look at this template and advise plz( its named as single track in attached itl file)
template.itl
over 9 years ago
OpenRail
OpenRail Forum
cut and fill
murtaza gul
hi every one i have few question about earth work in power rail track. Will keep it brief. 1-how to show cut and fill in different colours plan view, 2-how to show bridges and tunnels in different colour in vertical profile. 3-I think the end…
over 9 years ago