Foundation load summary : Post processing - Gravity forces from RAM Concrete VS RAM Steel

Hi,

Question 1: I am modeling a 1 story building, First floor is a raised floor with concrete slab and conc beams and roof has joists & metal deck. The gravity forces from RAM Concrete does not match with gravity forces RAM steel. Also, the RAM concrete forces are less than RAM steel forces. Can you please explain the reason for this difference in forces. 

Question 2: I have created another model with only one floor which has concrete beams and conc slab and I applied the roof load manually on the exterior beams. Again, the gravity forces from RAM Concrete does not match with RAM steel and RAM concrete forces are less than RAM steel forces. When I haven't modeled a steel member, why would there be forces from RAM steel?

please let me know.

Question 1:                                                                                                                                                Question 2

                                                       

Electrical bldg [Gravity Current-First floor only].rss