RAM Connection Elastic Weld Demand

I am using RAM Connection for a base plate.  The base plate has both uplift and shear concurrently.  I was looking to see how the interaction of tension and shear was done on the weld and cannot figure out what RAM is doing to calculate the demand. 

It says fv = V/Lshear and fa = P/L. 

Lshear is half of L and Lshear + L usually add up to the perimeter of the shape, but not always (ie an HSS4x4x1/4 has Lshear = 6.6" and L = 13.2" for a total of 19.8", I am getting 15.2" for the perimeter). 

Where in the code is it stated that Lshear should roughly 1/3 of the total perimeter and L should be 2/3 of the total perimeter?  I have looked everywhere in the code and commentary.

Thanks,

Turner