Hi,
When running the joint shear checks in RAM concrete for a SMF, I'm finding that the joint concrete strength is set to the concrete strength of the beam, not the concrete strength of the column. Is there an option to change the concrete strength at the joint to match the column?
In reality the higher strength concrete for the columns would be poured up through the column and puddled around the column/beam joint.
Thanks for the help,