Hello,
I am designing a PT slab for a 300' ft building. I need to create a pour gap for the long span. Is it a way to create this gap in concept ? I was thinking to manual cut the slab and create two separate slabs.
Thank you in advance.
Start here: https://communities.bentley.com/products/ram-staad/w/structural_analysis_and_design__wiki/30231/modeling-a-pour-strip
Answer Verified By: Nikos Moschovakis