Hi,
I am working on a SCCS bridge structure and trying to size columns but for some reason at a few columns results show NG even after filing the criteria. what can be the reason behind it?
There is more to E6.4a than just the Prc/Pc check. The rest of the section indicates that we have an interaction > 1 (it looks like the column is about 10% over from this report).