this is plan
i am able to generate floor load after creating the RCC wall. is my shear wall correct?
Type_V trial-R3.std
pls solve
On floor level you can model a dummy beam on top of wall and you will be able to apply floor load,floor load can only be applied on closed loop of beams.
beams are failing due to dummy beam in RCDC
Hello Praveen,
Joesph has correctly indicated to use dummy beam. But I would like to add few more points. When you are creating a dummy beam please use concrete density as zero and type as not specified.
This will help RCDC not to read the dummy member but you will be able to generate the load. If you still have the issue please upload STAAD model with dummy beam modelled in it.
Answer Verified By: Praveen Oswal
Thank you. It solved the problem