how can l solve the problem?

when l run the design of beam, the warning information is indicated below,

Member 1: Failed tension calculations for hogging at 0.000 m. Design not possible.
Member 2: Failed tension calculations for hogging at 0.000 m. Design not possible.

who can help me expain the reason?

thanks

Parents Reply Children