• RAM Concept Conflicting Audit Strip Results

    I have modeled a 1-way PT slab and beam system starting with RSS and importing into Concept. At the lowest level I have several columns that need to jog. The audits on the strips at those locations produce a couple sections with errors that suggest removing…