• Step in Slab in RAM Concept

    I'm looking at a podium slab with a 6" step in the top of slab (constant soffit across the step) for a topping slab in a courtyard area. We added a 75psf area DL in the 6" recessed area to account for the topping slab weight and get the following bottom…
  • Slabs Elevations in Ram

    Ram Concept doesn't consider discontinuity between slabs with different elevations even if the slabs are 100% in different plans. this issue was never mentioned in the manual or even in previous tutorials and topics.