• Wrong Loading Combination for Beam Optimization

    I am working on a two story steel building and am experiencing issues with the beam optimization. RAM is currently using a loading combination for some beams, displayed below, that is not the maximum loading so the beams are designed too small. Instead…
  • Training Opportunity - Designing/Optimizing Post Tensioned Concrete Slabs in RAM Concept (02/11/2020)

    Learn how to design and/or optimize post tensioned concrete slabs in RAM Concept CONNECT Edition! Register for our open-enrollment virtual training classes using the links below: Designing Post Tensioned Concrete Slabs in RAM Concept using Generated…
  • RAM Concept Training - Optimizing Post Tensioned Concrete Slabs in RAM Concept

    A new RAM Concept training course has been added to the Bentley LEARN Server. Learn how to optimize post tensioned concrete slabs in RAM Concept.