Controlling Earthworks Quantities

hello,
in the past (criteria) when we was running earthworks with the inp file, we write in the inp file to consider stripping.
look in the file attached.
we want to get those results in the report:

fill = C+D
cut = A
stripping = B+D

how we can get these in the component quantities ?

There is way to control the earthworks quantities  

thanks.