Good Morning,
I have a project where we are overlaying the roadway without milling, we are overlaying with a thickness of 7.5" on top of ex pavement. I would like to run a template that will run along the existing horizontal/vertical and will run 7.5" above the REOP or the LEOP (12' L/R of horizontal alignment). The 7.5" will very from LEOP to REOP. The top of the template will be 2% cross slope L/R and the bottom will follow ex ground. I would then like the template to create the vertical alignment for me. I imagine the overlay/milling template will work for this but doesn't the milling template work from the ex ground down? Any insight on how to accomplish this will be greatly appreciated.
Thanks,
it
For more information about the Road and Site design tools, visit the Road and Site design WIKI at: http://communities.bentley.com/products/road___site_design/w/road_and_site_design__wiki
I came across a few slides that may help in your research. There are a few overlay component slides at the end that could help you.
Answer Verified By: Chuck K.
Templates 202.pptx