In PowerGeopak 08.11.09.674, even though I can see that GPK_PROJMGR_PROJECTDIR is set to the proper directory when looking at the configuration variables, if I launch Project Manager, it completely ignores this and loads the last PRJ file I was in. Has this variable been depreciated in SS3? or is there an additional switch that needs to be set? The goal is that a user should simply need to select a project when launching PowerGeopak, and not have to navigate to the correct location from inside Project Manager.
For more information about the Road and Site design tools, visit the Road and Site design WIKI at: http://communities.bentley.com/products/road___site_design/w/road_and_site_design__wiki