How to calculate earthwork from Cross sections excluding existing Components/Features (InRoads V8i Select Series 2)

Good morning everyone.

I created a template for proposed roadway (Proposed Sidewalk, Driveway, Curb, HMA, Sub grade, etc.) and a template for the existing roadway (Existing pavement, Curb, Driveway, Sidewalk, etc.). I combined both into one template which works perfectly (Took forever but eventually worked). Then I create cross sections and try to calculate earthwork by the "End Volume Method" under Corridor Modeling. I go under the "Classification" tab and I set every existing Component to "Ignore". But for some reason when I run the End Volume Method, the calculations still include the Cut/Fill of the existing Quantities. 

The goal is to eliminate the volume of existing sidewalk, pavement, curb since they will be paid for by Individual pay items (such as Curb Removal) instead of Earthwork. Thus I only want the Earth Work Quantity for the Proposed components but I can't get get this. 

Could a problem be that I am including the Existing Surface which will calculate the difference between the Existing surface and proposed components? How should I approach this?

I have attached an example image of a cross sections:

Here is a cross section where the volume was calculated between the Existing Surface and all proposed components have been IGNORED. Thus the volume calculated for this cross section is the volume I want to IGNORE.

This next cross section is where  the volume was calculated between the Existing Surface and the proposed components. The existing components have been IGNORED. Thus the volume calculated for this cross section is the volume I want to calculate MINUS the existing volume in the previous image:

 

Any ideas on how I should approach this?

Parents Reply
  • Mark,

    Thank you for your response. I used the "End Area Volume" under Corridor Modeling, go to 'Classifications', and try to change the 'Classification' and 'Mass Ordinate' columns. Doing so I haven't been able to exclude the area of the existing components. The existing components are suppposed to represent the existing pavement, curb, sidewalk, etc. which will not be included in the earthwork calculations because there are separate removal pay items for them. I am trying to calculate the area between the bottom of the 'existing' components and the 'proposed' components.

    Correct. The existing components are created from the surface from Roadway Designer.

    I am using InRoads V8i Select Series 2. I apologize in advance if my vocabulary/jargon is not accurate as I am relatively new to InRoads.

    Thank you.
Children