OpenRoads Designer U2 - Custom Tasks & Position Mapping

Hi Folks,

I'm curious to know if anyone else is using the old style custom tasks and position mapping.

After adding MS_TASKNAVIGATION_CONFIGURATION with a value 1 I notice that the OpenRoads Modelling and OpenRoads Drawing Production drop down options disappear.

If I set MS_TASKNAVIGATION_CONFIGURATION to 0 and restart OpenRoads the drop down options that were missing return but obviously I lose my custom tool bar.

I'd quite like to have both so is this a design feature to make people use the ribbon system or a fault?

Josh