Hi Brian,
Yes I have a problem and I'm looking for an answer.
Unsuitable area under embankment is not being reported in total fill although it seems to taken into account in the Mass Haul.
Maybe this is a similar problem but I would like to find an answer or work around
Cheers
Bruce Wood
Bruce,
The end area volumes command provides a volume for the area of fill. It also provides the "topsoil to be replaced" which is the unsuitable material under fill areas. You are not getting this in your Volumes.xsl report?
Thomas
HI Thomas
Yes thanks for your note. When I annotate the cross sections with the volume areas I can see the topsoil to be replaced is anotated but this area is not included in the report. as fill. Not sure though if I'm using the latest xml report file.
It could also be my workflow that I need to twek somewhere.
You might have some other thoughts or I can send you a snap shot of the files
Hi Thomas
Please find attached a couple of PDF's showing cut situation and fill situation. It is a very simple cross section for about 40 km of road.
Also XML report file for the sample sections
You will note that the fill volume listed is above the stripped surface only but is included in the mass haul.
Bruce
Thanks for that, yes the fill volume is now included.
Versions that I'm using are
Microstation V08.05.02.55
Inroads V08.09.01.45
Projectwise V08.09.04.63