Corridor Earthwork Fill Components

I have a very simple template with a concrete barrier, a riprap base, subgrade and a side slope component.

My problem is that when I calculate earthwork using the corridor tools, I only get the cut quantities (pictured below).

How do I calculate the fill quantities?

This issue is while I'm using Power Geopak V8i (SS4) version 08.11.09.878