I've made a final TIN file and am working to get drainage areas for catch basins.
This is using TN DOT workflow and when I go to Delineate Watershed I get the following error:
Minimum Descent Ridge Loop = 101 Exceeded
There are a few spots within my TIN file where I get an actual drainage area but not many and certainly not near a proposed catch basin location.
Ideas?