I have two base lines that start at a specific station. one for example starts at 333+75.00 and the other starts 33+78.35.
I cannot get inroads to lay the stationing in correct. even it I start at a +50 station it goes 100 feet to the next station instead of 50 feet as seen in the example below.
is there a way to get inroads to start stationing at a specific station, and carry the correct interval to the station?
Any help is greatly appreciated.