Is it posible to clip a reference file to make plan sheets while moving the reference file without its boundary? Without causing any harm to the base file you reference in for you project. ( If I reference in a base file start at STA. 0+00 to STA. 20+00 and cut my 1st sheet. Then copy the 1st sheet and uncheck the move with boundary then move that sheet to STA. 20+00 to STA. 40+00.) Would this change the base file?
Hello Jerry, what Bentley product and version are you using?
Regards,
Jesse DringoliTechnical Support Manager, OpenFlowsBentley Communities Site AdministratorBentley Systems, Inc.
Hi Jesse ,Power GeoPak V8i Series 4
Thanks for confirming Jerry. I have moved your post to the appropriate product community forum where someone can assist you with this.
I'm not exactly following you...Could you be a little more descriptive about what steps you want to take and what you are trying to accomplish?
Generally, manipulating a reference file does nothing to the actual base file.
MaryB
Power GeoPak 08.11.09.918Power InRoads 08.11.09.918OpenRoads Designer 2021 R2
Move reference in Ref manager and toggle move ref boundary
Regards
Chris
AECOM Roads UK&I Digital Engineering, Design & Solutions Lead | Sector Information Management Lead
Associate Director – Digital
OpenRoads Designer 10.12 | MicroStation 2023 | ProjectWise CE 10.3.4 | ContextCapture | ProjectWise PowerShell 2023 | ProjectWise WSG API | Generative Components | OpenBridge Designer 10.12
Civil 3D 2023 | Dynamo | Navisworks Manage
PowerShell | Visual Studio | Office 365 | Power Platform | Teams | SharePoint | Visio
Speckle | BIMVision | Revizto | Solibri