Hello, "UseSprialLength" and "UseRunoutLength" are seen as false in the superelevation reports (as in the following picture). ORD doesn't use those while calculating the superelevation distances ? If it doesn't, how can i change it to involve runout length and spiral length in calculations ?

Parents Reply
  • If UseSpiralLength is true and UseRunoutLength is false, ORD will extrapolate the runout length based on the runoff rate defined by the full super value at the SC/CS point and zero at the respective PS/ST point.  The runout length will be calculated for each curve.

    Although I haven't used it, I believe that if you set UseRunoutLength to true in the runout calculation will be ignored and the fixed length will be applied, though apparently not on a curve by curve basis.  You might be able to achieve this using the equations.