Inroads vs Openroads

Hello

In Inroads when calculating volumes (from Cross sections) there was an option to compute Unsuitable Materials by Feature. You could specify a thickness for each material that had to be removed

Example was could be

Topsoil strip 200mm

Asphalt strip 100mm in one area and

Asphalt strip 150mm in another area

Peat strip 1200mm

etc.

Any help with setting this up would be great.

Thanks Sean

Parents Reply Children
No Data