Inroads XM: Runoff lengths are wrong

I'm using the AASHTO superelevation wizard, and after creating a superelelvation section, Inroads calculates the runoff length incorrectly.  In this example, for a 6.4% superelevation, it thinks the runoff should be 34.56 m.  I want it to be 79 m, which is the length given in the 2004 Greenbook for 6.4%, 100kph design speed, 2 lanes rotated. 

 Is there a place to tell inroads what the design speed is, or does it pull from the rate calculator in the first step of the wizard? 

Parents Reply Children
No Data