Hi

How can I create end condition to my corridor ( cut and fill) with 10cm soil?

I am using OpenRoads 10.09

regards

Sigfús

Parents
  • Hello Sigfus,

    I have a solution which might be a little convoluted but it does the job for me.

    I create and end condition and add overlay stripping element to it. After which I add end conditions to which I constrain the striping points to. Here are pictures.

    I've had to create a small simple elements triangles so I wouldn't have to overlay construction with the stripping since the striping is always vertical and I haven't found a way to change that.

    This is an end condition to the inside slope which has to be a certain height below the construction pie so it's constrained to another point(Nogaze1). Nogaze1 is constrained to the small triangle or can be to Edge of Shoulder.

    In this case the ditch is required so here are the remaining points until the outside slope.

    Here's the result.

    Hope you can extrapolate a viable solution to your issue.