I have a water main utility run that I have projected on to a profile. But can’t seem to get my water valves to project. They are not linked to the water main. ( not sure if possible).
how can I project a single glue node on to an alignment profile.
Connect edition 10.10
In the Drainage and Utilities functionality, you can only project a profile run onto an alignment. The profile run includes the pipes and nodes. If you only have a single node, then this technique isn't going to work.