I drew up an existing drainage network (pipes, manholes, etc.) for a road. I did this by creating a MODLRD file and manaully drawing up all the pipes and nodes for that area based off of survey.
Now I want to add inlets, manholes and pipes for my proposed design.
I was trying to figure out the best way to do this.
- Should I just keep expanding on that existing MODLRD file?
-Should I create a new MODLRD file for my proposed drainage and reference my existing drainage file? Can I just copy in my existing drainage?
One of the things that I need to do is try to modify existing inlet tops and change the tops to manholes while leaving the bottom structure the same.