InRoads survey Observation changes

I have a 22k point survey that I am in the middle of processing. It's not huge. I have to do a bit of point modification, but each observation/point change takes a minimum of a minute after hitting apply. Is this normal? Is there possibly a setting I have wrong? A file in the wrong location? Something that will drag everything down. I have to modify a decent amount of shots and its just bottle necking. 

Microstatio0n V8i (Select series 3) Version 08.11.09.459

Bentley InRoads Survey V8i (Select series 2) V08.11.07.615

Intel(R) Xeon(R) W-2125 CPU @ 4.00GHz   4.01 GHz

32.0 GB