I am trying to copy a vertical profile into other existing profile matching the stationing, but the Copy Vertical tool is not returning the expected output even when I check the Projected box. I can't use the Project Profile to Element because I need a complex geometry.
The profile on the left should be where the green arrow indicates.
I am also getting this message: "Reference profile is longer than it's plan element". I am not completely sure, but it doesn't seem to reflect what I have.
Thanks for the assistance.
Hi.
It would be better if you could share the dgn file and state the version of software used.
I am not able to understand the problem statement fully, Could you please elaborate it . following are my guess
1. is it same Alignment having more than one profile, and you try to copy profile data from one profile to other profile with the same horizontal alignment.
2. Two different alignment, copy vertical profile data from 1st alignment profile to 2nd Alignment Profile
regards
Babulal
Thanks & Regards
Babulal Sahu
Road & Railway Alignment Designer