Hi,Working with Inroads SS1 (8.11.07.246)I've just started to work with the new Overlay tools for Roadway Designer and for training I want to acomplish task according to the following scenario:1) milling existing pavement at a minimum depth of 4 cm for the station range;2) vertical alignment adjustment which is done by minimum overlay (6 cm) and maximum 12 cm. The overlay componet's bottom follow milled existing pavement and top is 6 to 12 cm above the milled surface.3) there is regular backbone components above ovelay component.As I understand, there are three possible scenarios for vertical adjustments: a) Simple overlay without milling, b) Overlay+Max milling only where is needed to put overlay component and c) minimum milling.I wonder is there a way to perform minimum milling with vertical adjustment done by overlay components.I found a workaround: First I create new "milled existing surface" and than use minimum overlay. Can I acomplish that in a single step?Thanks in advance for any tips.Adam.