Hello,
There is a way to control the report that we getting from the "Corridor Component Quantities".
examples:
1. Don't report about critical section's (pic1.png is attached)
2. Creating the report on section that I will choose and not the all corridor.
Thanks,
Assaf.
1. The sections that are included in the report come from the setting in the corridor Design Stages. If you look at the properties for the Design Stage, there is a section to Include Critical Sections which will have some values set to true. If you wish to only include the interval you must turn of all these options by setting them to false or changing the design stage in the corridor properties to a stage which doesn't include these critical sections.
2. The answer to the second part is related to the first answer. The sections that will be included are those that are drops in the corridor. The volumes report will run each time you open the command and to get end area volumes it is required to have more than one section. This is because it must have an interval it can use to compute the volumes, otherwise you will just get areas of components.
For more information about the Road and Site design tools, visit the Road and Site design WIKI at: http://communities.bentley.com/products/road___site_design/w/road_and_site_design__wiki
Hello Chris,
I attached a pic that showing the settings in the Design Stage.
the report created with those settings, and we still getting the Critical Sections.
how can I get rid of those Critical Sections ?
In the screenshot I see the Default Design Stage is in the selection and you are viewing the properties for it. Is that the design stage assigned to that particular corridor you are reporting on? Normally those name are a little different like "1- Preliminary Design" or "4-Final w/ Meshes", some name like that. I didn't know how to do this process before working through it to answer your question and that is the process I found to make the changes. Make sure you close the report browser and run the report again so it can export the correct data into the reports.
Chris, this is properties Design Stage that the report was create.
and still, I'm getting in the report stations that not in the interval.
(I dont know if those critical section's or somthing else... )
I attached a diffrent project.
take a look on the non regular stations, that I dont know them:
0+608.116 ?
0+688 ?
0+733 ?
.....
Please create report, and maybe you can tell me what those non regular stations.
Thanks, Assaf.
It definitely is pulling these stations from something other than the corridor. I can set the design stage to anything and the station 608+12 is included as a location with a template drop and included in the reports. I tried the '1-Preliminary' Design Stage with a Template drop Multiplier of 5 which pushes your drops to every 125' an made sure all critical sections are off and it still includes those stations. So I will continue investigating.