Hello,
There is a way to control the report that we getting from the "Corridor Component Quantities".
examples:
1. Don't report about critical section's (pic1.png is attached)
2. Creating the report on section that I will choose and not the all corridor.
Thanks,
Assaf.
In the screenshot I see the Default Design Stage is in the selection and you are viewing the properties for it. Is that the design stage assigned to that particular corridor you are reporting on? Normally those name are a little different like "1- Preliminary Design" or "4-Final w/ Meshes", some name like that. I didn't know how to do this process before working through it to answer your question and that is the process I found to make the changes. Make sure you close the report browser and run the report again so it can export the correct data into the reports.
For more information about the Road and Site design tools, visit the Road and Site design WIKI at: http://communities.bentley.com/products/road___site_design/w/road_and_site_design__wiki
Chris, this is properties Design Stage that the report was create.
and still, I'm getting in the report stations that not in the interval.
(I dont know if those critical section's or somthing else... )
I attached a diffrent project.
take a look on the non regular stations, that I dont know them:
0+608.116 ?
0+688 ?
0+733 ?
.....
Please create report, and maybe you can tell me what those non regular stations.
Thanks, Assaf.
It definitely is pulling these stations from something other than the corridor. I can set the design stage to anything and the station 608+12 is included as a location with a template drop and included in the reports. I tried the '1-Preliminary' Design Stage with a Template drop Multiplier of 5 which pushes your drops to every 125' an made sure all critical sections are off and it still includes those stations. So I will continue investigating.