• Station range of linear quantities

    Hi, I am working on an 8 mile corridor project. We have layed out perimeter controls and it is time for quantities. For shorter jobs, we use the horizontal alignment tracking tool to get the station range and then manually measure the length of the…
  • Inroads/Microstation, Rail Vertical Alignment coordination with Road Grade Crossing Vertical Alignment

    Hello All, Let me start with a description of the work.. Approx. 130 Miles of Proposed Track to run along existing Track. Approx. 260 Grade Crossings. Is there anyway to automatically import Track Vertical Elevation for each Cut of Roadway Grade…
  • Re: Existing Ground Cross Sections

    D-120337 filed in regards to a problem with the Profile Analysis command located under GEOPAK > ROAD > DTM Tools, open the DTM Menu > Analysis > Profiles