Bentley Communities
Bentley Communities
  • Site
  • User
  • Site
  • Search
  • User
OpenRoads | OpenSite
  • Product Communities
OpenRoads | OpenSite
OpenRoads | OpenSite Wiki Preventing intersection between embankment of two Parallel Roads
    • Sign In
    • -Road and Site Design - Wikis
      • +OpenRoads Designer
      • +OpenRoads ConceptStation
      • +OpenRail Designer
      • +OpenSite Designer
      • +OpenRoads Navigator Mobile App
      • +SS10/SS4/SS3 OpenRoads
      • +GEOPAK Native
      • +InRoads Native
      • -MX Native
        • +Analysis
        • +Arenium
        • Capture Google Earth image not working in MX SS4
        • Cycle MX Status Tooltips between Coincident strings.
        • +Data Import & Export
        • -Design Options
          • Creating Vertical Alignment throws an error
          • Earthwork Generation Error
          • Earthworks Strings not created correctly
          • Error "No Pavement styles sets specified"
          • How to create a Fillet Between two carriageway strings
          • MX Alignment - Writing Data Files [TN]
          • MX Alignment [TN]
          • Non-Tangential Alignments [TN]
          • Preventing intersection between embankment of two Parallel Roads
          • Video: Create Chainages from Fillet Tangent which is perpendicular to Road Centerline
          • Video: Create Junction Fillet
          • Video: Create Traffic Island
          • Video: Tidy Junction
          • Why are some Menus Grayed out?
        • +Display / Draw
        • +Drainage Design
        • +Error Messages
        • Graphical Filters for Terrain Models
        • How to Change Color Table in MX v8i Select Series 3
        • +Installation & Configuration
        • Maximum limit for chainage
        • +Modify
        • +MX and AutoCAD
        • +MX Tools / Add-Ins
        • MX v8i Showing Trial/Demo Message after Product Activation
        • MX v8i Status Tooltips
        • +MX-Trucs et Astuces [TN]
        • Pavement and Subgrade Design
        • +Project
        • +Project Explorer Settings
        • +Report
        • +Visualise
      • +OpenRoads SignCAD

     
     Questions about this article, topic, or product? Click here. 

    Preventing intersection between embankment of two Parallel Roads

    Applies To 
       
      Product(s): Bentley MXROAD
      Version(s): 08.11.07.566,08.11.09.493 & MXROAD V8i
      Environment:  N/A
      Area:  Design  
      Subarea:  Earthworks Wizard
      Original Author: Purva Lakde. Product Advantage Group

     

     

     

     

     

     

     

     

     

    BACKGROUND

    There are certain projects containing two Paralle Roads and two parallel Roads embankment are crossing to each other. Sometimes user requirement that the embankment should to be not cross each other. Many user have their CAD department manually tidy up the drawing at locations such as those. Other users like to get the software to do the tidy up process. MXROAD is the one of the application which will help user to tidy up the drawing at those locations.

    Steps to Accomplish

    1. Create a Master Road Centerline using Quick Alignment with Vertical Design.

    2. Offset from Master Centerline to Side Road through Design > Design a String > Horizontal Offset then convert Side Road to a 6D master string. (Modify > Edit Strings > Convert to a 6D master string).

     

    3. Create triangulation for both Master Road and Side Road separately.

    4. Design Carriageway and Earthwork for both Master Road and Side Road Separately. As shown in the below snapshot the two embankment are crossing each other.

    5. Create a triangulation of the Master Road including the earthwork and create a separate triangulation of the Side Road alignment including earthworks.

    6. Delete created earthworks for both Master Road and Side Road using Modify > Edit Strings > Delete Strings Groups as shown in the below snapshot. 

    7. Regenerate the Master Road Earthwork wizard to a triangulation of Parallel Road and Regenerate the Parallel Road Earthwork wizard to a triangulation of Master Road. You will see the Embankment of two Roads are not crossing to each other.

    Note: While regenerating the Earthwork Wizard for Master Road please make sure parallel Road model should be selected as a triangulation model and for Parallel Road make sure Master Road model should be selected as a triangulation model.

     

     

    • Share
    • History
    • More
    • Cancel
    • Purva Lakde Created by Bentley Colleague Purva Lakde
    • When: Thu, Sep 18 2014 9:25 AM
    • Purva Lakde Last revision by Bentley Colleague Purva Lakde
    • When: Thu, Sep 18 2014 9:26 AM
    • Revisions: 4
    • Comments: 0
    Recommended
    Related
    Communities
    • Home
    • Getting Started
    • Community Central
    • Products
    • Support
    • Secure File Upload
    • Feedback
    Support and Services
    • Home
    • Product Support
    • Downloads
    • Subscription Services Portal
    Training and Learning
    • Home
    • About Bentley Institute
    • My Learning History
    • Reference Books
    Social Media
    •    LinkedIn
    •    Facebook
    •    Twitter
    •    YouTube
    •    RSS Feed
    •    Email

    © 2023 Bentley Systems, Incorporated  |  Contact Us  |  Privacy |  Terms of Use  |  Cookies