You are currently reviewing an older revision of this page.
Document Type: TechNote Product(s): Bentley InRoads 2004 Edtion Version(s): 08.05.00.xx Original Author: Bentley Technical Support Group Legacy Document Number: 8371
Document Type: TechNote
Product(s): Bentley InRoads 2004 Edtion
Version(s): 08.05.00.xx
Original Author: Bentley Technical Support Group
Legacy Document Number: 8371
When working with an existing river basin DTM, the following workflow should depict the location where the 20 foot flood level will intercept with the original surface:
Option: Instead of creating two features for the river banks, use a horizontal alignment along the river to create a single feature. Then apply the decision table off both sides.
Product TechNotes and FAQs
InRoads Product TechNotes FAQs And Support Video Clips
Bentley Technical Support KnowledgeBase
Bentley LEARN Server
Bentley's Technical Support Group requests that you please confine any comments you have on this Wiki entry to this "Comments or Corrections?" section. THANK YOU!