Why would my printed report show a lower cost than the design assistant for a span?I have 20,000 feet of pipe (with a few other minor items) with a total material and labor cost of $178,254.40
The Cost Estimate report shows $163,717
This is a single span of pipe. I did place this again in 2 different spans and the cost differential is the same.
Any hints would be appreciated.
Expertdesigner V8i SS1
Using
Hi Peter,
I can reproduce something like this. I suspect that the cost in Design Assistant is accurate, and the report has a problem in calculating the labor cost. I'll investigate further, and if necessary create a defect for it. I'll let you know what I find.
Thanks,
Mike
We have checked the calculations on this, and found that the Design Assistant cost is correct, and the report is not correctly handling variable labor costs. We are now working on a fix.
Can you provide a tracking or reference number. I'd like to make sure this fix is loaded when available.
Thank you
The SR number is 7001025678.