Bentley Communities
Bentley Communities
  • Site
  • User
  • Site
  • Search
  • User
OpenUtilities
  • Product Communities
OpenUtilities
OpenUtilities Wiki Resize or disable capture tolerance boxes
    • Sign In
    • +OpenUtilities
    • Access Service Request Manager
    • +Bentley sisHYD Multi Utility
    • Design Features - promis.e Functionality - Promis.e Standard
    • +OpenUtilities sisNET - English
    • +OpenUtilities Substation
    • Promis.e Paths
    • -Promis.e Wiki
      • +CONNECT Edition - Promis.e
      • About Promis.e
      • -Administration Features - Promis.e
        • +Command Protection - Administration Features - Promis.e
        • +Language Database Manager - Administration Features - Promis.e
        • +Mode Manager - Administration Features - Promis.e
        • -Options - Administration Features - Promis.e
          • Cable conductor text appearance on cable diagrams and cross reference symbols
          • Cannot find PLC1.xls for tutorial
          • Change the company name and address that appears on the title block
          • Change what is displayed at wire links
          • Device tag changes when symbols are moved
          • Format output of Now title block variable
          • Make gauge and color appear with wire numbers
          • Manage page and project description names
          • Options
          • Remove the dash prefix from device tags
          • Resize or disable capture tolerance boxes
          • Symbol text does not transfer to symbols
          • Template Project Options - V8i
          • Text Settings - Control how text appears in the project
          • Underline normally closed contacts
        • +Setup - Administration Features - Promis.e
      • +APIs_VBA - Promis.e
      • +Automation Features - Promis.e
      • +Component Features - Promis.e
      • +Component Management - Promis.e
      • +CONNECT Services - Promis.e
      • +Data Manager - Promis.e
      • +Database Platform Support - Promis.e
      • +Display - Promis.e
      • +Drawing Management - Promis.e
      • +Engineering Design Considerations - Promis.e
      • Error - Object reference...General
      • +Find_Replace - Promis.e
      • Finding the Tutorial
      • +Installation_Configuration - Promis.e
      • +Interoperability - Promis.e
      • +Licensing - Promis.e
      • +Maintenance Features - Promis.e
      • +Migration - Promis.e
      • +OS Support - Promis.e
      • +Panel Layout - Promis.e
      • +Performance - Promis.e
      • +PowerPlatform Support - Promis.e
      • +Print_Publish Features - Promis.e
      • +ProjectWise Integration - Promis.e
      • Promis.e Help file
      • +Reports_Output Features - Promis.e
      • +Template Management - Promis.e
      • +Text Tools - Promis.e
      • Training FAQs
      • +Wire Numbering - Promis.e
      • +Wiring Features - Promis.e
      • +Project Management - Promis.e
      • Promis.e Title
      • Working from home with Promise.e
    • Replace Family - Find_Replace - Promis.e
    • SQL Server Login

     
     Questions about this article, topic, or product? Click here. 

    Resize or disable capture tolerance boxes

      Product(s): Promis.e, Bentley Substation
      Version(s): 08.11.10 - 08.11.13.73
      Environment: N\A
      Area: Administrative Features
      Subarea: Options

    How do I change the size of the red boxes that appear when drawing wires? Can I turn them off?

    Background

    When drawing wires, red boxes appear at nearby connection points. These boxes represent the capture tolerance. Wires that terminate within the limits indicated by these boxes will be connected to the connection point. The amount of tolerance and thus the size of the boxes is controlled by the Capture Tolerance setting. Changing the capture tolerance affects how precisely wires must be drawn.  This is not usually an issue when connection points and wires are "on grid".

    Steps to Accomplish

    To change the size of the capture tolerance boxes:

    1. With the project open or highlighted in Project Manager, select Options > Project Options > Wire Settings. If using SELECTseries 5 or 6, select Options > Project Options > Wire Options.
    2. On the Connection Preferences tab, adjust the value of the "Capture tolerance" field. A value of 0 (zero) will prevent the boxes from appearing when drawing wires.
    3. Repeat for other projects as desired.

    See Also

    Template Project Options - V8i

      Original Author: Matt_P
    • Options
    • promis.e
    • Wiring Features
    • Administrative Features
    • Draw Wire
    • how to
    • Bentley Substation
    • en
    • SELECTsupport
    • Share
    • History
    • More
    • Cancel
    • Matt_P Created by Communities MVP Matt_P
    • When: Tue, Jul 7 2015 4:03 PM
    • Jesse Dringoli Last revision by Bentley Colleague Communities MVP Jesse Dringoli
    • When: Fri, Mar 27 2020 2:53 PM
    • Revisions: 3
    • Comments: 0
    Recommended
    Related
    Communities
    • Home
    • Getting Started
    • Community Central
    • Products
    • Support
    • Secure File Upload
    • Feedback
    Support and Services
    • Home
    • Product Support
    • Downloads
    • Subscription Services Portal
    Training and Learning
    • Home
    • About Bentley Institute
    • My Learning History
    • Reference Books
    Social Media
    •    LinkedIn
    •    Facebook
    •    Twitter
    •    YouTube
    •    RSS Feed
    •    Email

    © 2023 Bentley Systems, Incorporated  |  Contact Us  |  Privacy |  Terms of Use  |  Cookies